We have building rockets down to a fine art. FAO – Flight Activities Officer (checklists, procedures, etc. This means our customers satellites are deployed to precise and individual orbits, even when flying as a rideshare.INCO – Integrated Communications Officer.PROCEDURES – Procedures, or Organization and Procedures Officer (enforced mission policy and rules).During the hot run the turbo pump delivers the fluid at high rotational speed. The feed lines, turbo pumps, valves and ducts of the engine have to be brought down to the temperature of the cryogenic fluid. TELMU – Telemetry, Electrical, and EVA Mobility Unit (lunar spacesuit) Officer This chill down is indispensable, particularly if the propulsion system has turbo pumps to deliver the extremely cold fluids.GNC – Guidance, Navigation, and Control Systems Engineer (responsible for the reaction control system, and CSM main engine).EECOM – Electrical, Environmental, and Consumables Management (monitored cryogenic levels, and cabin cooling/pressure systems electrical distribution systems).SURGEON – Flight Surgeon (directs all operational medical activities).GUIDANCE – Guidance Officer (monitored onboard navigational systems and onboard guidance computer software).FIDO – Flight Dynamics Officer (responsible for the flight path of the space vehicle).RETRO – Retrofire Officer (responsible for abort procedures and Trans-Earth Injection, or TEI, retrofire burns).BOOSTER – Booster Systems Engineer (monitored the Saturn V in pre-launch and ascent).The following "preflight check" order was used before the launch of Apollo 13: That means establishing bases both in lunar orbit and on the Moons surface. In the Apollo program, the MCC launch status check was initiated by the Flight Director, or FLIGHT. Launch vehicles: Space Launch System (SLS) Commercial launch vehicles. Main article: Apollo flight control positions The Launch director declares if a mission is go for launch.Ĭhecklist of firing room positions He reported to the Launch Director, who has another about 5 go/no go reports. The NTD was also responsible for the safety of all personnel inside the pad after external tank loading, including the flight crew, about 10 go/no go reports. The NTD was the leader of the shuttle test team responsible for directing and integrating all flight crew, orbiter, external tank/solid rocket booster and ground support testing in the shuttle launch countdown. For Space Shuttle missions, in the firing room at the Launch Control Center, the NASA Test Director (NTD) performed this check via a voice communications link with other NASA personnel. For greater details on NASA flight control personnel, see Flight controller.Ī launch status check, also known as a "go/no go poll" and several other terms, occurs at the beginning of an American spaceflight mission in which flight controllers monitoring various systems are queried for operation and readiness status before a launch can proceed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |